{"id":567,"date":"2026-11-21T14:30:26","date_gmt":"2026-11-21T13:30:26","guid":{"rendered":"https:\/\/heusje.nl\/?p=567"},"modified":"2026-11-21T16:57:17","modified_gmt":"2026-11-21T15:57:17","slug":"beyond-the-technical-solution","status":"publish","type":"post","link":"https:\/\/heusje.nl\/?p=567","title":{"rendered":"Beyond the technical solution"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">When I look back at my years at DSM and compare them with my experience at Covestro, one difference stands out. It concerns not so much the technical expertise available in the organisation, but the way people and disciplines are brought together to achieve a common result.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At DSM, I had become accustomed to an approach in which cooperation across functional boundaries was actively organised. At Covestro, I often experienced something different. Within individual functions, things generally worked quite smoothly. Responsibilities were clear, people knew their areas of expertise and established procedures provided a basis for getting things done.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The difficulties emerged when a project crossed those functional boundaries.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Organising cooperation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">At DSM, I became familiar with the Project Management Process (PMP) during my time in Emmen, when it was rolled out across the organisation. All middle and senior management went through the training, so it was not just a methodology introduced for project managers. It was intended to establish a common understanding of how projects should be organised and managed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A Project Management Office (PMO) was set up, staffed with people who had more extensive experience with PMP. They supported important projects, but also helped individuals with smaller activities. That could be as practical as moderating a Front End Loading (FEL) workshop to help a team define the scope and requirements of an initiative before moving ahead.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Gradually, people became familiar with the methodology and its terminology. It gave the organisation a shared language for discussing projects and, perhaps more importantly, a common way of thinking about responsibilities and ownership. \u201cWho is the owner?\u201d became a familiar question whenever a new project was proposed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">PMP was therefore much more than a methodology for planning activities, monitoring progress and controlling budgets. Requirements, responsibilities, interfaces, risks and decisions were made explicit. It also provided a way to deal with conflicts between scope, quality, resources and timing. From then on, in DSM all project followed this methodology.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Front End Loading (FEL) was an important part of this approach. Before a project moved into execution, the relevant disciplines were brought together to establish what was actually required, what the solution should deliver, which interfaces needed attention and whether the project was sufficiently prepared to proceed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This did not mean that every project ran smoothly, or that decisions were always easy. But there was a structure in which issues could be raised and addressed. The project manager was responsible for progress, while the interests of the business, the end users and the quality of the final result were also part of the project governance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At Covestro, I often missed that kind of deliberate cross-functional organisation. Cooperation seemed to rely much more on assumptions about what each function was supposed to deliver and where its responsibilities began and ended.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">People would act on what they understood to be their functional duties, but the interfaces, dependencies and shared responsibilities were not necessarily made explicit. Everyone might be doing what they considered to be their part, without necessarily having a common understanding of how all those contributions were supposed to produce the desired result.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The organisation had the necessary expertise, but the project structure did not always provide a sufficiently strong mechanism to connect it.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">The technical solution and the people<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">There was another aspect that I increasingly missed: attention to the human and organisational consequences of introducing a technical solution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">I sometimes had the impression that once the technical problem had been defined and a solution selected, the remaining challenge was primarily to implement it. The effects on the people who would have to work with the new system, and on the organisation in which it would be embedded, seemed to receive considerably less attention.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But introducing a new technical system can change much more than the technology itself. It can change people&#8217;s roles, responsibilities, working relationships and sense of autonomy. It can affect how they see their own contribution and how much ownership they feel towards the result.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">My experience with the Rotterdam control-room project at DSM had taught me something quite different. The operators were not simply recipients of a new technical solution. Their knowledge and experience helped shape the way the new control room would function. They were involved in identifying what information they needed and how they could use it in their daily work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By involving them in solving problems they themselves experienced, we created understanding and ownership. The acceptance of the new environment was not something that could simply be achieved through instructions or training afterwards. It developed through their involvement in the design itself.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">I had learned that a technical solution and the organisation in which it would operate needed to be developed together.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">I saw the importance of this particularly clearly in the programme to develop and roll out a standardised MES solution.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">A standardised solution for different plants<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">From a functional organisational perspective, such a project is quite complex. An MES does not operate in isolation. It interacts with the plant&#8217;s DCS, which brings Engineering and the local Process Control specialists into the picture. IT is involved in several different capacities: providing the infrastructure and addressing IT\/OT security, but also ensuring professional implementation, replication of installations across plants and day-to-day support.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There are further interfaces. Connections to the data platform and SAP have to be established, including the requirements for formal reporting. A central department is involved in standardising KPIs and organising performance reviews. Plant Process Engineering has to ensure that the solution reflects the actual production processes and opportunities for improvement. And, of course, plant management and its management hierarchy have their own responsibilities and expectations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Each of these parties has a legitimate contribution to make. Within their own functional domain, responsibilities and ways of working are generally quite clear. But the project has to bring all these contributions together into one functioning solution. The technical interfaces are only part of that challenge. The different parties also need to agree on requirements, priorities, responsibilities, dependencies and the way the eventual system will be used and supported.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There is another dimension to this complexity: plants are not interchangeable.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">They differ in process type, technology, operational practices and the level of automation already in place. Sites also differ considerably in size and organisational resources. A large site may have local specialists in Process Control, IT and Process Engineering who can actively support an implementation. A smaller plant may have very limited local resources and depend much more on external or central support.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The availability of local knowledge is equally important. People who know the plant and its processes can help translate general requirements into something that actually works in that particular operation. But their capacity to contribute varies, as does the extent to which that knowledge is available within the local organisation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Bringing all this together is quite a challenge. A standardised solution has to accommodate different functional disciplines, different plant environments and different levels of local expertise and resources. It requires a balance between central standards and local requirements, between technical consistency and operational usefulness.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In other words, this is not primarily a technical implementation challenge. It is a multidisciplinary organisational change project. The technical solution is only one part of it; the real challenge is to bring all the people, expertise and local circumstances together around a common result.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">And it was precisely in this respect that I felt the project organisation was falling short.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">From involvement to implementation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The prototype had been preceded by quite an extensive analysis of system requirements, drawing on needs identified at several plants. At the start of the implementation, the original functionality was also validated at the plant where the first rollout was to take place. This exercise brought additional, plant-specific requirements to light. However, these were dismissed, largely on the grounds that the solution had to remain standardised.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Once the initial analysis had been completed and the direction established, the project increasingly went its own way. There was communication with the plant, of course, but it tended to remain at a fairly conceptual level. The message, for example, was that we were working towards a \u201cpaperless control room\u201d. That sounded like a substantial ambition, whereas the actual scope being prepared was considerably more modest.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The plant therefore knew the general direction in which things were supposed to develop, but had little concrete understanding of what the eventual solution would look like or how its specific operational needs would be addressed. I remember the sentiment in the plant being something like: \u201cI don&#8217;t know what&#8217;s coming. Let&#8217;s see what we get.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">I found this revealing. The initial analysis and validation had created opportunities for genuine involvement, but that involvement had not continued throughout the development process. The plant had gradually become more of a recipient than a participant.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This created something of a vicious circle. The plants were not sufficiently involved to develop a sense of ownership, while the project was not getting the continuing feedback and operational knowledge that could have helped make the solution more useful. By the time the plants could see what had been developed, many of the important choices had already been made.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There was a further issue. The work on the prototype and first implementation revealed that the solution was not yet sufficiently mature. There were still important questions about its functionality and practical applicability. Nevertheless, the standard had already been declared, and management expectations increasingly focused on a fast rollout.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">I found this difficult to reconcile. The quality of the prototype and first implementation should have been an important input into deciding whether the solution was ready to become a standard. Instead, the declaration of the standard and the expectation of a rapid rollout seemed to have acquired a momentum of their own.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Even though the shortcomings were known, the programme manager continued to push for rollout. I had the impression that maintaining the appearance of progress and avoiding visible delays had become important in their own right. The potential consequences for the quality of the solution delivered to the end users seemed to receive insufficient attention.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What frustrated me was not that there were delays or technical problems. Those are normal in projects. It was that I did not see a sufficiently strong project governance structure in which the different interests could be brought together, the risks made explicit and the consequences of proceeding discussed independently of the pressure to show progress.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With the PMP approach I knew from DSM, the tension between speed and quality would at least have had a place within the project structure. It would have been an issue to be addressed with the relevant disciplines and decision-makers, rather than something left largely to the judgement and priorities of the project manager.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Making plant performance visible<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">I encountered related questions in another initiative: the development and rollout of a system to capture plant performance. The intention was to make performance information available through dashboards across the organisation and to create a reliable data basis for further optimisation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">One particular objective was to identify targets that might have been set too low. A plant can achieve its KPIs quite comfortably, while the targets themselves conceal opportunities for much better performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">My own contribution was to obtain the data and transform it into views that provide insight. But the success of such a system depends on more than the quality of the data or the dashboards. The people in the plants have to trust its purpose and the way the information will be used. They need to be able to discuss targets, challenge assumptions and accept that a good KPI result does not necessarily mean that the plant is performing as well as it could.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This connects with something I had already experienced at DSM. Particularly in China, I encountered resistance to MES functionality that automatically recorded plant performance. I sometimes wondered whether this had to do with plants losing some control over how their performance was communicated to the wider organisation. My experience elsewhere at DSM was different: plants were generally more open to transparency and support from central departments. The USA was also quite receptive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The difference made me realise that introducing such a system can affect established relationships and perceptions of autonomy. For it to achieve its purpose, the information must be seen as a basis for learning and improvement, rather than merely as an instrument of monitoring and comparison.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There were also practical project-management issues. The project lead was responsible for the overall result, but not for all the activities that determined it. Contacts with the plants, for example, were managed exclusively by someone else. Other parties could approach the supplier with requests for additional functionality, without necessarily aligning those requests with the project&#8217;s priorities.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">I also saw inconsistencies in the application of working practices. Changes were not always validated in a QA environment before being moved into production, even though this was an established principle. Delays and time pressure sometimes encouraged greater risk-taking.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Again, these were not necessarily problems of technical expertise or individual commitment. They illustrated how difficult it can be to coordinate contributions and make decisions across organisational boundaries. In this case, the challenge was compounded by the need to build trust in the very information the system was intended to make visible.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What I came to miss<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Looking back, I would not conclude that functional departments are the problem, or that DSM&#8217;s way of working was perfect. Both approaches have their trade-offs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">What I came to value at DSM was the recognition that technical expertise alone does not produce an integrated result. Management development, work processes, empowerment and project governance reinforced one another.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The basic management training helped people understand their responsibilities and how to work with others. PMP provided a framework for organising the interaction between disciplines. And the emphasis on empowerment gave people room to take responsibility and contribute beyond the narrow boundaries of their own functions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At Covestro, I sometimes encountered these elements as separate things, rather than as parts of one coherent approach. The technical solution received considerable attention, but the organisational arrangements and human conditions needed to make it successful seemed less systematically addressed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A plant does not experience an Engineering problem, a Technology problem, an HR problem and a management problem separately. It experiences one problem. The organisation may need specialised functions to solve the individual parts, but somebody still has to connect them into a solution that works for the plant and the people who operate it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Perhaps this was the source of much of my frustration. I had learned at DSM that successful projects required more than technical expertise and clearly defined functional responsibilities. They required deliberate cooperation, shared ownership and attention to the people who would ultimately have to make the result work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The technical solution may be essential. But it is rarely the whole solution.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>When I look back at my years at DSM and compare them with my experience at Covestro, one difference stands out. It concerns not so much the technical expertise available in the organisation, but the way people and disciplines are brought together to achieve a common result. At DSM, I had become accustomed to an [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_heusje_archive_order":142,"footnotes":""},"categories":[22],"tags":[19,18,21,23,20],"class_list":["post-567","post","type-post","status-publish","format-standard","hentry","category-career","tag-career","tag-covestro","tag-dsm","tag-english","tag-work-culture"],"_links":{"self":[{"href":"https:\/\/heusje.nl\/index.php?rest_route=\/wp\/v2\/posts\/567","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/heusje.nl\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/heusje.nl\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/heusje.nl\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/heusje.nl\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=567"}],"version-history":[{"count":34,"href":"https:\/\/heusje.nl\/index.php?rest_route=\/wp\/v2\/posts\/567\/revisions"}],"predecessor-version":[{"id":604,"href":"https:\/\/heusje.nl\/index.php?rest_route=\/wp\/v2\/posts\/567\/revisions\/604"}],"wp:attachment":[{"href":"https:\/\/heusje.nl\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=567"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/heusje.nl\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=567"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/heusje.nl\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}